
6 - 8
Chapter
6
Chapter
6
- Specifications and Parts List
UX5000 Electrical Specifications
Power Supply
AC Power Supply
Dedicated 15 Amp circuit
Power Requirements: 120 VAC @ 15A Controlling/Base Chassis
Power Consumption: Rate Load 1: 3.3 @ 8A, 5V @ 1.5A, -48V @ 0A, -28V @ 3.43A,
-24V @ 0A, -27.3V @ 0.2A
AC Input Current: 2.53 A typ. 120V/60Hz
Pin=162.5Watt typ.
PF=Pin/VA = 0.535 typ.
Rate Load 2: 3.3 @ 8A, 5V @ 1.5A, -48V @ 2A, -28V @ 0A,
-24V @ 0A, -27.3V @ 0.2A
AC Input Current: 2.55 A typ. 120V/60Hz
Pin=158.5Watt typ.
PF=Pin/VA = 0.518 typ.
Input Voltage: 100VAC to 240VAC (Rated Voltage: 115VAC / 120VAC)
Output Voltage Type Supplied: +3.3VDC / +5VDC / -24VDC / -48VDC / -27.3VDC
(Charging Voltage for Battery Backup
Frequency: 45Hz - 66Hz (Rated frequency: 50/60Hz)
Phase and Wire: Single Phase 2 Line Type
Grounding Requirements: No. 14 AWG copper wire
Feeding Voltage
Digital/OPX/DID: -48V
SLT: 25mA / -28V
3-Slot Chassis or 6-Slot Chassis:
With input voltage of 120 VAC, 50/60Hz, 2.19A and with full load conditions:
Output Power: Base Chassis=136W, Expansion 1 Chassis=272W, Expansion 2
Chassis=408W, Expansion Chassis 3=544W
AC Input I: Base Chassis=2.55A, Expansion 1 Chassis=5.10A, Expansion 2
Chassis=7.65A, Expansion Chassis 3=10.20A
VA @ 120V: Base Chassis=306VA, Expansion 1 Chassis=612VA, Expansion 2
Chassis=918VA, Expansion Chassis 3=1224VA
KWh @ AC Input I x 120V/1000: Base Chassis=.306KWH, Expansion 1
Chassis=.612KWH, Expansion 2 Chassis=.918KWH, Expansion
Chassis 3=1.224KWH
BTU (KWh x 3413): Base Chassis=1004 btu, Expansion 1 Chassis=2008 btu, Expansion
2 Chassis=3012 btu, Expansion Chassis 3=4016 btu
ADA/APR/GBA Adapters, 16-Button DLS, 60-Button DSS, Digital and IP Terminals:
Electrical Standard: FCC Part15 Class B, FCC Part68
Safety Standard: UL/CSA 60950
BCH/BHA Adapters:
Electrical Standard: FCC Part15, Sub Part C, FCC Part68
Safety Standard: UL/CSA 60950
Summary of Contents for UX5000
Page 12: ...x Table of Contents Table of Contents...
Page 18: ...1 6 Chapter 1 Chapter 1 Installing the Chassis...
Page 26: ...1 14 Chapter 1 Chapter 1 Installing the Chassis...
Page 84: ...1 72 Chapter 1 Chapter 1 Installing the Chassis...
Page 90: ...2 4 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 98: ...2 12 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 113: ...Chapter 2 Blade Installation and Startup Chapter 2 2 27 Figure 2 11 EXIFU CABLING...
Page 144: ...2 58 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 172: ...2 86 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 174: ...2 88 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 208: ...4 14 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 212: ...4 18 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 220: ...4 26 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 222: ...4 28 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 224: ...4 30 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 226: ...4 32 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 228: ...4 34 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 254: ...4 60 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 260: ...4 66 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 274: ...4 80 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 284: ...5 4 Chapter 5 Chapter 5 LAN Connection...
Page 332: ...vi Index Index...