![NEC Express5800/R320a-E4 User Manual Download Page 44](http://html.mh-extra.com/html/nec/express5800-r320a-e4/express5800-r320a-e4_user-manual_251301044.webp)
3-14 Installing Server
Steps to Install the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
1.
Open the front door of the tower conversion kit.
If the door is locked, use the server-accessory key to
unlock.
2.
Confirm the spots to fix 4 core nuts on the front
of the chassis.
See the figure on the right for where to fix the
core nuts
(2 on the front top and 2 on the front bottom.)
4 core nuts have been installed on the front of the
chassis.
3.
Remove one screw that fixes the AC lock bracket
on the rear of the tower conversion kit.
Tower conversion kit (on the front bottom)
Tower conversion kit (on the front top)