![NEC Express5800/R320a-E4 User Manual Download Page 37](http://html.mh-extra.com/html/nec/express5800-r320a-e4/express5800-r320a-e4_user-manual_251301037.webp)
Installing Server
3-7
3.
Fix the core nuts to the front side of the rack.
Attach them symmetrically (total: 4 core nuts).
Fix a core nut from inside of the rack.
Hook either of the clips of the core nut
to a square hole of the rack, and hook
the other clip to a hole by a flat-blade
screwdriver.
4.
Remove two CPU/IO modules from
the 4U chassis.
5.
Remove the DVD drive unit from
the 4U chassis.
Core nuts
Core nuts
4U
(top of device)
2U
1U
Bottom of device
3U
Inside of
the rack
Outside of
the rack