2-2
Setting Up the System
Overview
This chapter describes how to select a site, unpack the server, install your rack-
mount server, make cable connections, and power your server.
Selecting a Site
The system operates reliably in a typical office environment.
Choose a site that is:
!
Near grounded, three-pronged power outlets.
Note
:
For the United States and Canada, this means a
NEMA 5-15R outlets for 100-120 VAC or NEMA 6-15R
outlets for 200-240 VAC. For other international sites, this
means three-pronged power outlets applicable for the
electrical code of the region.
!
WARNING
Be sure the power service connection is through a properly
grounded outlet.
!
CAUTION
When two power supplies are installed in the system the
power plug from each of the power supplies must be
plugged into the same common ground power outlets.
!
Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
!
Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
!
Easily accessible for system maintenance and installation of system
upgrades.
Summary of Contents for Express5800/120Rc-2
Page 1: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Page 2: ...xxx ...
Page 3: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Page 43: ...Setting Up the System 2 15 Figure 2 13 Attaching Cables to the Cable Arm Assembly ...
Page 52: ...2 24 Setting Up the System 2 1 1 2 Figure 2 20 Making Connections ...
Page 76: ......
Page 158: ...5 22 Problem Solving ...
Page 169: ...B Technical Specifications Server Unit ...
Page 172: ......
Page 173: ...C Connectors Overview External Device Connector Pinout Information ...
Page 188: ......
Page 193: ...xx ...
Page 194: ... 456 01554 000 ...