Upgrading Your Server 9-5
PREPARING FOR INSTALLATION AND REMOVAL
Prepare the installation or removal of a component depending on the following procedure:
1.
Shut down the OS.
2.
Press the POWER switch to turn off the power of the server. (The POWER/SLEEP lamp
goes off.)
3.
Pull out all the power cords from the AC inlet on the server.
4.
Remove all the cables connected to the server on the rear panel.
5.
Make the clearance of 1 m to 2 m in the front and rear sides and left and right sides of the
server.
Summary of Contents for Express5800 120Lh
Page 1: ...N8100 941F 942F 943F NEC Express5800 120Lh User s Guide 1st Edition 08 2004 856 124032 101 00...
Page 138: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 174: ...7 12 Maintenance This page is intentionally left blank...
Page 265: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below...
Page 274: ...10 10 Internal Cabling Diagrams This page is intentionally left blank...
Page 276: ...A 2 Specifications This page is intentionally left blank...
Page 314: ...F 4 Product Configuration Record Table This page is intentionally left blank...