General Description 2-19
POST
POST (Power On Self-Test) is the self-diagnostic program stored in the system memory.
When you power on the server, the system automatically runs POST to check the mother board,
ECC memory module, CPU module, keyboard, and mouse. POST also displays messages of the
BIOS setup utility, such as the start-up message, while in progress.
With the factory setup of the server, the NEC logo appears on the display unit while POST is in
progress. (To display the POST check results, press
Esc
.)
NOTE:
You can set the POST check results to appear on the display
unit without pressing
Esc
. To do so, select "Enabled" for "Boot-time
Diag Screen" under the Advanced menu of the BIOS setup utility.
The POST check results should be checked in the following cases.
When the server is used for the first time.
When the server appears to fail.
When the server beeps for many times between power-on and OS start-up.
When an error message appears on the display unit.
Summary of Contents for Express5800 120Lh
Page 1: ...N8100 941F 942F 943F NEC Express5800 120Lh User s Guide 1st Edition 08 2004 856 124032 101 00...
Page 138: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 174: ...7 12 Maintenance This page is intentionally left blank...
Page 265: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below...
Page 274: ...10 10 Internal Cabling Diagrams This page is intentionally left blank...
Page 276: ...A 2 Specifications This page is intentionally left blank...
Page 314: ...F 4 Product Configuration Record Table This page is intentionally left blank...