6-12
164.
Protect the server with the shock-absorbing materials, and pack it securely.
IMPORTANT:
Check and adjust the system clock before operating the server again after relocating or
storing it.
If the server and the built-in optional devices are moved from a cold place to a warm place
in a short time, condensation will occur and cause malfunctions and breakdown when these
are used in such state.
When you start operating these equipments again after the
transportation or the storage,
make sure to wait for a sufficient period of time to use them in
the operating environment.
If the system clock goes out of alignment remarkably as time goes by, though the system
clock adjustment is performed, contact your sales agent.
Summary of Contents for Express 5800/320Lb-R
Page 10: ...iv This page is intentionally left blank ...
Page 17: ...1 3 Label D Label C Label B Label A Label E ...
Page 18: ...1 4 Rack mount Model Label A Label D Label E Label C Label B ...
Page 19: ...1 5 Label D Label C Label B Label A Label E ...
Page 21: ...1 7 Label A Internal View Label B Label B ...
Page 36: ...1 22 This page is intentionally left blank ...
Page 44: ...2 8 Front View inside Tower model Rack mount model ...
Page 83: ...3 9 This page is intentionally left blank ...
Page 84: ......
Page 177: ...5 49 Not support ...
Page 191: ...5 63 This page is intentionally left blank ...
Page 192: ......
Page 254: ...8 12 Check the disk status to confirm that the disk is added successfully ...
Page 273: ...8 31 Chapter 7 Troubleshooting ...
Page 283: ...8 41 18 Use cable ties to fasten the extra length of cables Cable ties included with cabinet ...
Page 297: ...8 55 This page is intentionally left blank ...
Page 298: ......