![background image](http://html1.mh-extra.com/html/nec/ds1000/ds1000_correspondence-course-workbook_3847435047.webp)
DS1000/2000 Correspondence Course
DS1000 System Installation
NEC America
DS1000/2000 Workbook
◆
47
Hanging the Cabinet
1. Screw suitable fasteners 11 3/16” apart in a convenient location on the
MDF. Be sure to leave the fasteners “backed out” about 3/16” from the
MDF backboard.
2. Hang the cabinet as shown.
❏
Attach the ground wire(s).
The ground connects from the sys-
tem to the ground termination using
12 AWG stranded copper wire.
●
You must connect your system to
a known earth ground.
1. Loosen the lug on the cabinet’s
ground connection.
2. Run a 12 AWG stranded copper
wire from the ground lug to a
known earth ground.
3. Firmly retighten the lug loosened
in step 1 above.
Do not plug in the power cord or reinstall the
right side panel until the cabling is complete.
80200 - 3
11 - 3/16"
To earth ground
80200 - 26