Hardware Installation
2-165
Dry Wall with Metal C-Stud Frame Installation
For a dry wall with metal C-studs frame, NCR recommends to use a minimum of six
toggle anchors and bolts to secure the kiosk to the wall.
The wall must be prepared, mounting holes drilled, and anchors installed before final
siting of the kiosk. It is the responsibility of the owning institution to provide the bolts
and anchors for the kiosk.
For wall, bolt holes and anchor details, refer to the
NCR SelfServ™ XK32 (2247) Site
Preparation
(BCC5-0000-5377).
To install the kiosk to a dry wall, perform the following steps:
1. Install the Wall Bracket to the wall, see
Installing the Wall Bracket - Dry Wall
2. Install the Main Frame, see
3. Install the Top Poles, see
4. Install the Signage, see
5. Install the Door Assembly, see
6. Install the Display, see
7. Install the Printer, see
8. If required, install the PIN Pad terminals, see
9. Route the Internal Cables, see
Summary of Contents for SelfServ XK32
Page 1: ...Installation Guide NCR SelfServ XK32 2247 Kiosk Release 1 0 BCC5 0000 5246 Issue B...
Page 13: ...Product Overview 1 3 Product Labels...
Page 14: ...1 4 Product Overview Configurations...
Page 27: ...Hardware Installation 2 17...
Page 28: ...2 18 Hardware Installation...
Page 218: ...2 208 Hardware Installation Single Sided Kiosk with PIN Pad Payment Device...
Page 222: ...2 212 Hardware Installation Dual Sided Kiosk with PIN Pad Payment Device...
Page 226: ...2 216 Hardware Installation Dual Sided Kiosk with PIN Pad Payment Device...
Page 227: ...Hardware Installation 2 217 Port Assignments...