27
W415-1539 / A / 04.19.16
EN
IMPORTANT: Before fi nishing in the appliance test the operation using the remote control, cycling it
through all of its different modes, see “OPERATION” section. Should trouble shooting be required,
access to the controls can be made through the pre-fi nishing access panel.
!
WARNING
METAL STUDS REQUIRED TO ENSURE CLEARANCE TO COMBUSTIBLES.
16 1/4"
413mm
631/2"
1613mm
MINIMUM
53 3/4"
1365mm
50 "
1270mm
MINIMUM
CLEARANCES TO COMBUSTIBLE FRAMING
AND SIDES OF VENTING MUST BE A
MINIMUM OF 1”. WHERE NOT POSSIBLE
METALS STUDS ARE REQUIRED.
NOTE: TOP HEADER MUST BE
INSTALLED AFTER FIREPLACE
HAS BEEN POSITIONED.
See section “VENTING” for vent clearances
NOTE:
• Power vent system available with reduced vent pipe clearances. Contact your authorized
dealer/distributor for more information.