© by N&W GLOBAL VENDING S.p.A.
45
07 - 2010 3375 - 01
ProduCt CoNtaINErs
- Remove the containers from the machine;
disassemble the product outlet ports and extract the
-
augers from the rear side of the container;
-clean all the parts by using a solution of hot water and
sanitising products and dry them carefully.
BoIlER MaIntEnanCE
Descale the boiler at regular intervals, according to the
hardness of the mains water and the number of selec-
tions you have performed.
This operation must be carried out by qualified
technical personnel only.
to descale, remove the boiler from the machine.
to descale, use biodegradable, atoxic and non-aggres-
sive products only.
Rinse abundantly before re-assembling the parts.
on reassembling, make sure that:
- Electrical contacts (terminals, faston, etc.) are perfectly
dried and well-tightened;
- safety and anti-boil thermostats are properly positioned
and connected;
- Water connections are correct.
Fig. 29
2.5 l container base
1-
Gear wheels
2-
Pins for wheel
3-
2.5 l container
4-
Beater spring
5-
Container covers
6-
6 l container
7-
Auger
8-
Powder outlet port
9-
Fig. 30
Anti-boil thermostats (manually reset)
1-
Overflow tube
2-
Safety thermostat (manually reset)
3-
Water dispensing pumps
4-
Heating element terminals
5-
Boiler connectors
6-
Bayonet connection
7-
Guide for coupling (right-left)
8-
Pump guides
9-
Locking lever
10-
Locking indentation
11-
Summary of Contents for Canto Plus Instant
Page 2: ......
Page 5: ......
Page 6: ......
Page 60: ...sx48501 TZ...
Page 61: ...Canto SCHEMA ELETTRICO WIRING DIAGRAM ALIMENTAZIONE POWER SUPPLY TZ...
Page 62: ...sx48701...
Page 63: ...Canto SCHEMA ELETTRICO WIRING DIAGRAM PORTA DOOR...
Page 64: ...sx48501...
Page 65: ...Canto SCHEMA ELETTRICO WIRING DIAGRAM MACCHINA INSTANT INSTANT MACHINE...
Page 68: ......