background image

 

9 of 9

 

Document Number: 020009017  May 12, 2022

Subject: BIC Tune Up 

 

‰

Verify operation with manager? Step 1 page 2. Note manager concerns: 

 ___________________________________________ 

 ___________________________________________ 

 ___________________________________________ 

 ___________________________________________ 

 ___________________________________________ 

 ___________________________________________ 

 ___________________________________________

 

‰

Record firmware and recipe versions at beginning of Tune Up? Step 2 page 2.  

UI SW VERSION ____________   SRB SW VERSION __________  

LEFT MIXER SW ____________   RIGHT MIXER SW  __________  

FILE __________________   MENU CONNECT    __________

 

‰

Record “DRINKS SINCE INSTALLATION”? Step 3 page 2.  

LEFT MIXER COUNT _________   TOTAL COUNT  ____________  

RIGHT MIXER COUNT _________

 

‰

Record “DRINKS SINCE LAST MAINTENANCE  DATE” . Step 3 page 2.  

LEFT MIXER COUNT _________   TOTAL COUNT  ____________  

RIGHT MIXER COUNT _________

 

‰

Replace Blender Grate O-rings? Step 7 page 2.

 

‰

Pour beverage drain cleaner down the left blend chamber  drain, dispense area 

drain and the right blend chamber drain? Step 14 page 2.

 

‰

Replaced the LMS Valves? Step 16 - Step 22 page 4.

 

‰

Remove the ice bin. Step 24 & Step 25 page 4.

 

‰

Replaced the shaver blade? Step 28 page 4. 

 

‰

Remove the ice shaver gasket from the ice bin and/or the  top of the dispense area 

cover? Clean the surface areas? Step 31 page 4.

 

‰

Replace the shaver gasket? Step 33 page 4.

 

‰

Wash, rinse and sanitize the ice bin? Step 30 page 4.

 

‰

Pour beverage drain cleaner down the ice condensate bowl drain opening? Step 27 

page 4.

 

‰

Replaced the shaver belt? Step 39 & 40 on page 5.

 

‰

Replace the CO2 and Water supply line O-rings? Step 43 & 44 on page 6.

 

‰

Clean the condenser coil? Step 45 page 6.

 

‰

Clean the condensate pan? Step 46 page 6.

 

‰

Clean the condensate drain line? Step 47 page 6.

 

‰

Pour hot water down drain openings of the ice bin, right blend chamber, dispense 

area, and left blend chamber? Step 49 page 6.

 

‰

Work the drains by hand squeezing out any buildup? Step 51 - 52 on page 6.

 

‰

Connect water, CO2, drain, and power cord?  Step 55 page 6.

 

‰

Rear drain line connected correctly to store drain?         

‰

YES          

‰

NO

 

‰

Set the water pressure regulator to 35 psi dynamic? Step 56 page 6.

 

‰

Set the CO2 pressure regulator to 35 psi dynamic? Step 56 page 6.

 

‰

Re-install all exterior panels?  Step 58 page 7.

 

‰

Retrieve product from the walk in cooler and return to the  BIC refrigerated cabinet? 

Step 60 page 7.

 

‰

Verify and assign flavor slot assignments in accordance to  McDonald’s Corporate? 

Step 60 page 7.

 

‰

Complete the Zone 2 cleaning? Step 59 page 7.

 

‰

Confirm  “CONFIGURE YOGURT SMALL DISPENSE” to zero (0). Step 63 page 7.

 

‰

Confirm “PLUNGE SPEED” is set at 15. Step 65 page 8

 

‰

Confirm “CUP OFFSET” is set at 2.0. Step 65 page 8

 

‰

Perform calibration for all flavors, water, and ice?  Step 66 page 8.

 

‰

Reset “LAST MAINTENANCE DATE”? Step B page 8.

 

‰

Make samples of drinks with manager present. Step 69 page 8.

 

‰

Fax or email completed Tune Up Checklist to the RISE Group at  920-683-

7592 or [email protected]

 

‰

Submit claim for service work through Multiplex Claims Processing System.  

Tune Up Checklist MUST be attached to claim or claim will be DENIED. 

Technician Signature:  

 Date: 

 

Technician Printed Name:  

 

Time In:  

Service Agent:  

 

Time Out:  

By signing this you agree that the Preventive Maintenance has been done completely and is satisfactory.

Store Manager/Operator Signature:  

 Date: 

 

Store Manager/Operator Printed Name:  

 

Time:  

BIC TUNE UP CHECKLIST

Store #   
Store Address  
  

 

  

 

 

Store Phone #  

Serial Number  

 

Model  

Summary of Contents for BIC MA-8-2

Page 1: ...IPTION PART NUMBER 1 SWITCH REED RINSE AREA MOD 2160033 1 SWITCH REED RINSE AREA GRAY 2162748 5 FUSE 5A MIXER BOARD 2193015 1 SWITCH SNAP ACTION MINI BLEN HM 2194807 1 BOARD SRB BIC GEN2 2195346 2 CONTROL BLENDER BIC HSM 2195363 1 CONTROL 7 IN UI BIC 000 BIC 01F9 S 1 RELAY 24DC COIL DPDT 2196069 2 FUSE 4A DC HARNESS 2198785 1 PUMP FLOJET NSF NO ASO 3239675 1 MIXER MTR 6MM 120V 50 60 GEN3 SW 323982...

Page 2: ...rewdriver or pair of needle nose pliers remove the O rings from each blender grate and discard 7 Replace with new O rings over the tip on both grates 8 Wash rinse and sanitize the blender and dispense grates 9 Prepare a five 5 gallon bucket with luke warm tap water no hotter than 105 F 40 5 C and cleaning solution Clean all eight 8 product fittings and connect the cleaning manifold 10 Position the...

Page 3: ...ea and the pushing up of the tubing inside of the cabinet until the top of the dispensing plate is easily accessible 17 Using a Phillips head screw driver remove the two 2 screws from the metal mounting plate that secures a block of three 3 LMS valves to the dispensing valve mounting plate NOTE The tubing is numbered and will need to be returned to the same position within the dispensing mounting ...

Page 4: ... using caution not to damage the micro switch push rod Use caution not to lose any of the three 3 ice bin grommets attached to the base of the ice bin bowl 26 Wash rinse and sanitize the condensate bowl 27 Carefully pour beverage drain cleaner down the ice condensate bowl drain opening 28 Remove the two 2 screws that secure the shaver blade and shims to the ice bin and ice chute cartridge 29 Insta...

Page 5: ... Once the shaver belt is replaced the motor will be returned or very near this same position when tight 38 Locate the four 4 hex head bolts that secure the shaver motor to the motor mounting bracket A Completely remove one of the bolts that secure the Hall Effect sensor mounting bracket to the motor mounting bracket Loosen the remaining three 3 hex head bolts B Swing the Hall Effect mounting brack...

Page 6: ...and CO2 supply lines and pressure observe for any leaks 54 Power the unit ON using the ON OFF switch located on the upper left side of the unit next to the USB port 55 Connect drain and plug in unit to outlet 56 Verify the water and CO2 pressure regulators are set to 35 psi dynamic and adjust if necessary A The regulators are located on the upper left side of the unit NOTE To achieve a dynamic pre...

Page 7: ...lect the Configure Slots Icon Select Slot Flavor Select the slot requiring reassignment Select Unassign Flavor and then select the GREEN Check Select the newly Unassigned Slot and select the correct flavor assignment Select the Return Arrow three 3 times to return to the main easyToUCH screen Select product Inventory Icon Select the reassigned flavor and follow the steps for replacing a product ba...

Page 8: ...ds must be entered to reset the yearly maintenance reminder even though the shafts have NOT been changed Select the MANAGER MENU Select A for the password Select the GREEN check Select the Down Arrow and select SERVICE Select A for the password Select the GREEN check Arrow DOWN and select PLANNED MAINTENANCE Select MIXER MAINTENANCE PERFORMED A 4 0 2 and before Enter SILENCE for password Select th...

Page 9: ...ge5 ReplacetheCO2andWatersupplylineO rings Step43 44onpage6 Cleanthecondensercoil Step45page6 Cleanthecondensatepan Step46page6 Cleanthecondensatedrainline Step47page6 Pourhotwaterdowndrainopeningsoftheicebin rightblendchamber dispense area andleftblendchamber Step49page6 Workthedrainsbyhandsqueezingoutanybuildup Step51 52onpage6 Connectwater CO2 drain andpowercord Step55page6 Reardrainlineconnect...

Reviews: