5 of 9
Document Number: 020009017 May 12, 2022
Subject: BIC Tune Up
34. Reinstall the ice bin to the condensate bowl using the
four (4) screws.
NOTE: Use caution not to damage the push rod.
35. Remove the two (2) Phillips head screws that secure the
rear panel to the units frame and remove the rear panel.
36. Locate the mounting bracket that houses the power
supply, relays and SRB. Remove the two (2) screws that
secure the mounting bracket to the units frame.
A. Slightly lift the bracket releasing the right side
hinge then carefully lower the bracket down
towards the lower refrigerated cabinet.
37. Mark the position of the shaver motor as currently
positioned within the motor mounting bracket.
NOTE: Once the shaver belt is replaced the motor will be
returned or very near this same position when tight.
38. Locate the four (4) hex head bolts that secure the
shaver motor to the motor mounting bracket.
A. Completely remove one of the bolts that secure
the Hall Effect sensor mounting bracket to the
motor mounting bracket. Loosen the remaining
three (3) hex head bolts.
B. Swing the Hall Effect mounting bracket to the side
allowing room for easy removal of the shaver belt.
39. Remove the existing shaver belt.
40. Replace the provided shaver belt reversing the actions
in Step 37. Tighten the belt by pulling back on the
motor before completely tightening the hex head bolts.
Motor should be positioned at or near the previous
placed reference mark.
41. Confirm Hall Effect Sensor is 1/16 of an inch back from
the edge of the bracket and in good condition.
42. Disconnect the water and CO2 supply lines.