
TRENDING
8. 469PC PROGRAM
8-10
8.9 TRENDING
Trending from the SR469 can be accomplished via the 469PC program. Many different paramters can be trended and graphed at
sampling periods ranging from 1 second up to 1 hour.
The parameters which can be Trended by the 469PC program are:
Currents/Voltages
Phase Currents A,B&C
Avg. Phase Current
Motor Load
Current Unbalance
Ground Current
Differential Currents A,B & C
System Frequency
Voltages Vab, Vbc, Vca Van, Vbn & Vcn
Power
Power Factor
Real Power (kW)
Reactive Power (kvar)
Apparent Power (kVA)
Positive Watthours
Positive Varhours
Negative Varhours
Temperature
Hottest Stator RTD
Thermal Capacity Used
RTD’s 1 through 12
Demands
Current
Peak Current
Reactive Power
Peak Reactive Power,
Apparent Power
Peak Apparent Power
Others
Analog Inputs 1,2 3 & 4
Tachometer
1. To use the Trending function, run the 469PC program and establish communications with a connected SR469 relay.
2. Select Actual , Trending from the main menu to open the Trending window.
3. Press the Setup button to enter the Graph Attribute page.
4. Program the Graphs which are to be displayed by selecting the pull down menu beside
each Graph Description. Change the Color, Style, Width, Group #, and Spline selection
as desired.
Select the same Group # for all paramaters to be scaled together.
5. Select Save to store these Graph Attributes, and OK to close this window.
7. Use the pulldown menu to select the Sample Rate, click the checkboxes of the Graphs to
be displayed, and select RUN to begin the trending sampling.
8. Print will copy the window to the system printer. More information for navigating through
Trending can be found under Help.
Summary of Contents for SR469
Page 7: ......
Page 19: ...2 INSTALLATION MECHANICAL 2 5 2 1 5 TERMINAL LOCATIONS Figure 2 11 TERMINAL LAYOUT...
Page 21: ...2 INSTALLATION ELECTRICAL 2 7 Figure 2 12 TYPICAL WIRING DIAGRAM...
Page 32: ...ELECTRICAL 2 INSTALLATION 2 18 2 2 14 TYPICAL 2 SPEED MOTOR WIRING...
Page 39: ...OVERVIEW 3 SR469 OPERATION 3 6 yy SETPOINTS yy S1 SR469 SETUP...
Page 104: ...4 SETPOINT PROGRAMMING S11 MONITORING 4 65 Figure 4 24 TRIP COIL SUPERVISION...
Page 113: ...S12 ANALOG I O 4 SETPOINT PROGRAMMING 4 74...
Page 244: ...8 469PC PROGRAM WAVEFORM CAPTURE 8 13 Figure 8 11 WAVEFORM CAPTURE...