![Muller Elektronik TANK-Control II Installation And Operating Instructions Manual Download Page 32](http://html1.mh-extra.com/html/muller-elektronik/tank-control-ii/tank-control-ii_installation-and-operating-instructions-manual_1853809032.webp)
8
"Sensors" menu - configuration and calibration
Carrying out calibration
32
V2.20161017
30252060-02-EN
⇨
The following screen will appear:
3.
Empty the tank completely.
4.
Press:
⇨
The following screen will appear:
⇨
You have reached calibration point 00.
⇨
The fill level is exactly 0 litres.
⇨
The float height is 15mm.
5.
Press:
⇨
The following screen will appear:
6.
Fill the tank with water until the following screen appears:
7.
Stop adding water.
www.ROLTRONIK.pl
Summary of Contents for TANK-Control II
Page 65: ...w w w R O L T R O N I K p l...
Page 66: ...w w w R O L T R O N I K p l...