3
Eco 40-55-75 manual revision 01/10
1 GENERAL INFORMATION
1.1 MANUFACTURER
CAV S.r.l. has been manufacturing Service control units for industrial use for more than thirty years; this
experience has led to a considerable technological Know-how based on many years of R&D activities
carried out in tight connection with the product manufacturing and trading on the international market, and
this is the best quality guarantee that CAV can offer to users.
1.2 POINTS OF SALE AND SERVICE CENTRES
CAV directly offers after-sales service for its products sold in Italy or in Europe.
(Sales, After-sales, Spare parts)
CAV S.r.l.,
Via Morandi, 90 - Toscanella di Dozza (Bologna), Italy
Postal Code 40060
Phone +39 (0)542 673488
E-mail: [email protected]
Customers are kindly requested to contact the above-indicated central After-sales Service for any doubt or
clarification about use, maintenance or request for spare parts. Please remember to specify the Machine
identification details that can be found on the nameplates:
See Nameplate A, paragraph 3.9
1.3 CERTIFICATES
The Machine complies with the prevailing European Union Directives applicable at the moment of its
release on the market, as detailed in the declaration of conformity.
1.4 WARRANTY
Machine components are covered by a 12-month (twelve months) warranty: this period starts from the date
indicated on the purchase document (invoice).
Warranty does not cover electrical and electronic parts.
Warranty only covers faulty parts, no labour costs and service call fee.
Warranty excludes any Exhauster damage due to:
•
transport and/or handling;
•
wrong or improper use of the Machine;
•
failed compliance with maintenance specifications given in this Manual; (see paragraph 6.5)
•
failures and/or faults not ascribable to faulty parts.
1.5 CUSTOMER'S OBLIGATIONS
The Customer shall, within the time frame agreed upon with the Manufacturer, fulfil its obligations indicated
in the Documents attached to the sales contract. Unless otherwise agreed, the Customer normally shall
take care of:
•
Preparing the rooms, including any required building works and/or channels.
•
Air supply with compressed air (see paragraph 4.6.1).
•
Machine Power Supply, complying with the prevailing rules in the Country of use (see paragraph
4.6.2).
Summary of Contents for CA Eco 40
Page 22: ...Eco 40 55 75 manual revision 01 10 22 Electric circuit diagram Eco 40 ...
Page 23: ...23 Eco 40 55 75 manual revision 01 10 Eco 40 ...
Page 24: ...Eco 40 55 75 manual revision 01 10 24 Eco 55 75 ...
Page 25: ...25 Eco 40 55 75 manual revision 01 10 Eco 55 75 ...
Page 26: ...Eco 40 55 75 manual revision 01 10 26 Eco 55 75 Eco 40 ...
Page 27: ...27 Eco 40 55 75 manual revision 01 10 ...
Page 33: ...33 Eco 40 55 75 manual revision 01 10 Date Operation description Signature ...