SWG100 User Manual
MRU GmbH, D-74172 Neckarsulm
Safety regulations
The analyzer may only be used as indicated in this manual. Our analyzers are checked
according to the following regulations:
VDE 0411 (EN61010) and DIN VDE 0701 before they leave the MRU GmbH factory.
MRU technical products are designed and manufactured according to DIN 31000/ VDE 1000
and UVV = VBG 4 of the professional guilds for fine mechanics and electrical engineering.
MRU GmbH assures that the analyzer complies to the essential requirements of the legal
regulations of the member states of the electro-magnetic compatibility (89/336/EWG) and to the
low-voltage regulations (3/23/EWG).
Specific safety regulations
No part of the analyzer, or any other metal parts & accessories shall be used as electric
conductors.
The analyzer shall not be used in or under water.
The analyzer shall not be placed near or directly exposed to open fire or heat.
The analyzer shall avoid dropping.
CAUTION
Acid substances
Moisture or condensate, being pumped out of the condensate outlet
port can be slightly acidic.
•
In case of skin contact IMMEDIATELY: clean affected parts of the
body.
•
Avoid getting liquid in eyes.
Please carefully clean all parts that come into contact with the
condensate.
1.1.
Packing
Packing regulation of 12.07.1991
If your local waste facility does not except MRU packing materials for disposal, you may return it
to MRU or our local sales representative. Packing materials returned to MRU must be returned
prepaid.
1.2.
Return of hazardous waste
Waste Disposal/Returns/Warranty -
MRU GmbH is required to accept the return of hazardous waste such as electro-chemical
sensors that cannot be disposed of locally. Hazardous waste must be returned to MRU prepaid.
1.3.
Return of analyzer
MRU GmbH is required to accept the return, for proper disposal, of all analyzers delivered after
13th of August 2005. Analyzers must be returned to MRU prepaid.
1.4.
MRU guarantee conditions
MRU granted of the analyzer SWG100 CEM a guarantee of 12 month.
1. 6 month on MRU spare parts.
2. The term of the guarantee conditions starts as of the invoice date.
Summary of Contents for SWG100 CEM
Page 1: ...SWG100 User Manual MRU GmbH D 74172 Neckarsulm ...
Page 2: ...MRU GmbH SWG 100 User Manual MRU GmbH D 74172 Neckarsulm 2 155 ...
Page 102: ......
Page 142: ...MRU GmbH SWG 100 User Manual Page 142 of 155 13 10 Option NDIR bench for CO2 analysis 0 100 ...
Page 154: ...MRU GmbH SWG 100 User Manual Page 154 of 155 14 Declaration of conformity ...
Page 155: ...MRU GmbH SWG 100 User Manual Page 155 of 155 V1 00 EN ...