![mru SWG100 CEM User Manual Download Page 5](http://html.mh-extra.com/html/mru/swg100-cem/swg100-cem_user-manual_1846047005.webp)
SWG100 User Manual
MRU GmbH, D-74172 Neckarsulm
Inspect Shipment for Damage
Carefully inspect the entire shipment for damage in the presence of the shipper’s agent,
removing packaging material if necessary. Note any damage to packaging and/or goods on
Packing List and have it signed by the shipper’s agent prior to accepting the sh
ipment. Submit
damage claim to MRU immediately.
NOTE: Damage claims not received by MRU within 3 days of receipt of shipment will not be
accepted.
The products described in this manual are subject to continuous development and improvement
and it is therefore acknowledged that this manual may contain errors or omissions. MRU
encourages customer feedback and welcomes any comments or suggestions relating to the
product or documentation.
Please forward all comments or suggestions to the Customer Feedback Department at the
following address:
MRU GmbH
Fuchshalde 8 + 12
74172 Neckarsulm / Obereisesheim
GERMANY
Fon (+49) 71 32 99 62 0 (Reception)
Fon (+49) 71 32 99 62 61 (Service)
Fax (+49) 71 32 99 62 20
Email:
Homepage:
This manual is intended solely as a guide to the use of the product.
MRU shall not be liable for any loss or damage whatsoever arising from content errors or
misinterpretation of information’s from this manual or any mis
-use resulting from the use of this
manual.
FOR MORE INFORMATION ABOUT COMPANY MRU PLEASE VISIT OUR WEBSITE
Summary of Contents for SWG100 CEM
Page 1: ...SWG100 User Manual MRU GmbH D 74172 Neckarsulm ...
Page 2: ...MRU GmbH SWG 100 User Manual MRU GmbH D 74172 Neckarsulm 2 155 ...
Page 102: ......
Page 142: ...MRU GmbH SWG 100 User Manual Page 142 of 155 13 10 Option NDIR bench for CO2 analysis 0 100 ...
Page 154: ...MRU GmbH SWG 100 User Manual Page 154 of 155 14 Declaration of conformity ...
Page 155: ...MRU GmbH SWG 100 User Manual Page 155 of 155 V1 00 EN ...