13/60
ST_PM_ Installation Manual_EN_V1.0 | 08.2020
Copyright © 2020 Mounting Systems GmbH
6.1.5
Potential equalisation
Via the support posts, the individual tracker arrays must be connected with each other
and to the equipotential bonding strip in the control cabinet using grounding conductors.
The control cabinets must be connected to the on-site grounding system.
Grounding conductor:
round wire galvanised RD 8 (minimum cross-section as per
the relevant standard)
6.1.6
Cable trench
The exact location and dimensions of the cable trench are defined by the
project planners and are specified in your project-specific documents.
1
Inverter/transformer station
4
Cable trench
7
Control
cabinet
2
Sigma View (optional)
5
Tilt sensor
3
Wind mast
6
Motor
Figure 2 Schematic diagram of cable trench