
Index
– continued
DRAFT
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
Apr 2001
192
Report any damage, 58
Required documents, 13, 14, 17, 18
RF Cabinet Alarm Cable Connection, 36
RF Cabinet Span and Modem Cable Connection, 36
RF GPS Cable, 36
RF I/O area, 94
RF I/O Plate, 93
RF interference, 49
RGPS Cable, 36
RGPS Head, 48
RGPS Mounting Considerations, 48
Roof load carrying limits, 63
ROOFTOP , 32
Rooftop Mounting Preparation, 40
Rooftop Elevated Mounting Procedure, 41
Rooftop Elevated Substructure Mounting, 63
S
Safety glasses, 38
safety glasses, 38
satellites, 48
Scope of Document, 12
sector configuration, 92
Sector/Carrier Configurations, 92
shipped fully assembled, 53
Shipping Crate, 56, 57
shop vacuum, 40
Side Cable Entry Hole Preparation, 146
Simplified Cabinet Cabling Diagram, 77
Site Document, 13
Site preparation – Overview, 30
sky, 49
snow loading, 32
Static sensitive equipment, 58, 75
submersion, 31, 34, 40
surges, 103, 131
T
Telco Interface Board TIB, 26
Tin Snips, 51
Tools and equipment required, 99, 140, 159
Transmission Lines – RF, 35
Transmit/Receive Module TRX, 25
trenches, 43
U
Unpack/Upright Procedure , 54
unpacking process, 52
V
vandalism, 31, 34
Views of Cabinet Side Walls below Shroud, 147
W
Weight, 33
weight, 32
Whats Next and Cleanup, 13
windstay latch, 60
wrist strap, 75
wriststrap, 58
Z
Zoning requirements, 32