
Introduction
– continued
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
Apr 2001
V02.03
18
Installation Hardware
Table 1-2 shows the quantity and description of the installation hardware
that is shipped with the RF Cabinet and with the Power Cabinet.
Figure 1-1 is a template guide for identifying the parts.
Table 1-2: Installation Hardware Supplied with Cabinets
RF
Power
Description
1
1
7/16” Hex Tool
1
1
ESD Wrist Strap
4
4
Cabinet Mounting Brackets
8
8
M12 x 30 Bolts (for Mounting Brackets)
4
4
Insulating Shoulder Washer (for Mounting Bolts)
4
4
5/8” Bolts (to replace eye bolts)
1
1
Compression Lug (for #2 AWG Ground Wire)
2
2
M6 Stainless Steel Locking Hex Nuts (for Ground Lug)
4
4
M12 x 100 Bolt
4
16
M12 Flat Washer
4
4
M12 Lock Washer
4
4
M12 Nut
1
1
Motorola Ivory Touch–Up Paint
2
2
M6 Flat Washer
6
6
M10 Nut
6
6
M10 Flat Washer
6
6
M10 Lock Washer
4
4
5/8” Flat Washer
4
4
Large Flat Washer
1
–
Weatherseal Bushing and Nut for RGPS Cable
1
–
MMI Cable
–
12
Battery Terminal Straps
–
3
#2/0 AWG INS WELD Cable (Red)
–
3
#2/0 AWG INS WELD Cable (Black)
–
12
90
°
Compression Lug (for #2/0 AWG DC Cable)
–
1
Twisted Pair Cable (for Power Cabinet Alarms to RF Cabinet)
1