
SC 4812ET/SC 614 BTS DC Power Sharing
– continued
DRAFT
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
Apr 2001
V0D.03
150
Figure D-3: Cold Shrinking the compression lug
COLD SHRINK TUBING
2910262A12 (SUPPLIED
IN INSTALLATION KIT)
Figure D-4: Cover installation
COVER
SCREWS
Reinstall Access Panel
The objective of this procedure is to reinstall the access panel at the
bottom of the SC 614 BTS. Refer to Figure D-5 and follow the
procedures in Table D-4.
D