Hardware Preparation and Installation
1-5
1
Unpacking Instructions
Note
If the shipping carton is damaged upon receipt, request
that the carrier's agent be present during the unpacking
and inspection of the equipment.
Unpack the equipment from the shipping carton. Refer to the
packing list and verify that all items are present. Save the packing
material for storing and reshipping of equipment.
!
Caution
Avoid touching areas of integrated circuitry; static
discharge can damage circuits.
Hardware Configuration
To produce the desired configuration and ensure proper operation
of the MVME2603/2604, you may need to carry out certain
hardware modifications before installing the module.
Note that the debugger
initializes the MVME2603/
2604.
Using the Debugger
5-3
You may also wish to obtain the
PPCBug
Firmware Package UserÕs Manual
, listed in
Appendix A,
Related Documentation
.
A-1
Initialize the system clock.
Using the Debugger
, Debugger Commands, the
SET
command
5-6
Examine and/or change
environmental parameters.
CNFG and ENV Commands
6-2
and/or 6-3
Program the board as needed
for your applications.
MVME2600 Series Single Board Computer
ProgrammerÕs Reference Guide
, listed in Appendix
A,
Related Documentation
.
A-1
Table 1-2. Startup Overview (Continued)
What you need to do...
Refer to...
On page...
Summary of Contents for MVME2603-1121A
Page 1: ...MVME2600 Series Single Board Computer Installation and Use V2600A IH2 ...
Page 6: ......
Page 12: ...xii ...
Page 14: ...xiv ...
Page 70: ...System Considerations 1 54 1 ...
Page 86: ...Programming Considerations 2 16 2 ...
Page 112: ...Block Diagram 3 26 3 ...
Page 174: ...Related Specifications A 10 A ...
Page 178: ...FCC Compliance B 4 B ...
Page 188: ...Proper Grounding C 10 C ...
Page 206: ...Glossary GL 14 G L O S S A R Y ...