Hardware Preparation
MVME166IG/D2
2-5
2
SRAM Backup Power Source Select Header J7
Header J7 is used to select the power source used to backup the SRAM on the
MVME166.
C
aution
Do not remove all jumpers from J7. This may disable the
SRAM.
If the battery is removed, jumpers must be installed on J7,
between pins 1 to 3 and pins 2 to 4, as shown in the Factory
Configuration drawing above.
J7
1
5
2
6
Primary Source OnboardBattery
Secondary Source Onboard Battery
J7
1
5
2
6
Primary Source 5V STBY
Secondary Source 5V STBY
(Factory Configuration)
J7
1
5
2
6
Primary Source 5V STBY
Secondary Source Onboard Battery
J7
1
5
2
6
Primary Source Onboard Battery
Secondary Source 5V STBY
Summary of Contents for MVME166
Page 1: ...MVME166 Single Board Computer Installation Guide MVME166IG D2 ...
Page 12: ...xii ...
Page 14: ...xiv ...
Page 46: ...Hardware Preparation and Installation 2 10 MVME166 Single Board Computer Installation Guide 2 ...
Page 70: ...Debugger General Information 3 24 MVME166 Single Board Computer Installation Guide 3 ...
Page 114: ...Disk Tape Controller Data B 6 MVME166 Single Board Computer Installation Guide B ...
Page 116: ...Network Controller Data C 2 MVME166 Single Board Computer Installation Guide C ...