![Motorola MTR2000 Installation And Operation Manual Download Page 57](http://html.mh-extra.com/html/motorola/mtr2000/mtr2000_installation-and-operation-manual_241115057.webp)
Installation
30
68P81096E37-N
06/28/05
age resulting from use of any other charging systems will void the war-
ranty. Refer to qualified sales/service representative for charger
ordering information.
The station is to be connected to a battery supply that is in accordance
with the applicable electrical codes for the end use country; for example,
the National Electric Code ANSI/NFPA No.70 for the U.S.
Cables are supplied with the charging option. Do not make connections
directly from the station to the storage battery
. Connect as shown in
Figure 10.
CAUTION
!
Figure 10. Making Connections to Storage Battery
DC input Connector located at
rear of the station for hooking up
the Battery backup system.
Required input power:
• Voltage - 14.2 Vdc Low Power (LP)
28.4 Vdc High Power (HP)
• Current - 11.5 Amps LP
13.0 Amps HP
Both positive and negative terminals must be
protected with appropriate fast acting fuses.
Secondary circuitry must be SELV type and
be installed nearby, preferable in the same
building.
All installations shall be carried out by trained
service personnel only.
Connector ESD
cover must be in
place when Battery
Backup cable is not
in use – to prevent
exposure to live
contacts.
CAUTION
!