
Chapter Five: Theory of Operation
Flow Path
31
Chapter Five: Theory of Operation
The 1479 Flow Controller measures the mass flow rate of a gas and controls the flow rate
according to a given set point. The control range is from 2 to 100% of Full Scale (F.S.) with an
accuracy of ±1% of F.S.
Flow Path
Upon entering the flow controller, the gas stream passes first through the metering section of the
instrument for its mass flow to be measured. The gas moves on through the control valve for its
rate of flow to be regulated according to the given set point, and then exits the instrument at the
established rate of flow.
The metering section consists of one of the following:
•
A sensor tube for ranges < 10 sccm (N
2
equivalent)
•
A sensor tube and parallel bypass for ranges > 10 sccm (N
2
equivalent)
The geometry of the sensor tube, in conjunction with the specified full scale flow rate, ensures
fully developed laminar flow in the sensing region. The bypass elements are specifically
matched to the characteristics of the sensor tube to achieve a laminar flow splitting ratio which
remains constant throughout each range.
Measurement Technique
The flow measurement is based on differential heat transfer between the temperature sensing
heater elements which are attached symmetrically to the sensor tube. This senses the thermal
mass movement which is converted to mass flow via the specific heat, C
p
, of the gas. The
resulting signal is amplified to provide a 0 to 5 VDC output which is proportional to mass flow.
Summary of Contents for Mass-Flo 1479A
Page 3: ...119474 P1 Rev B 10 97 MKS Type 1479A Mass Flo Controller ...
Page 8: ...Table of Contents vi ...
Page 10: ...List of Figures and Tables viii ...
Page 34: ...Control Valve Chapter Three Overview 24 This page intentionally left blank ...
Page 40: ...The Optional Input Chapter Four Operation 30 This page intentionally left blank ...
Page 44: ...Zero Adjustment Chapter Six Maintenance 34 This page intentionally left blank ...
Page 70: ...Model Code Appendix D Model Code 60 This page intentionally left blank ...