
Down Port Controller Mounting Instructions
Chapter Two: Installation
24
4.
Clean the sealing surfaces of the MFC and substrate using a clean room swab dampened
with a solvent such as isopropyl alcohol. Wipe the surfaces in a circular pattern with
light pressure. Blow clean the surfaces with filtered nitrogen.
Note
Clean all re-used sealing surfaces prior to resealing. The C-seals are not
reusable and should be discarded after use.
5.
Use filtered nitrogen to blow clean the controller and C-seal.
6.
Invert the controller and place the C-seal in the retainer, onto the controller bottom
surface.
M5-0.8 x 30 mm Long
Mounting Screw (1 of 4)
C-Seal and Retainer
Assembly
Screw Retaining Tab
Figure 10: Exploded View of the C-Seal Components
7.
Align the C-seal in the counter bore and the two screw holes in the retainer, with the
screw holes in the controller.
8.
Insert the mounting screws through the controller and thread them through the retainer so
that the locking tabs in the retainer hold the screws and seal in place.
The controller has been designed for M5 x 30 mm socket head cap screws. You may use
10-32 UNF x 1.25 long socket head cap screws instead of the metric screws, however the
retainer will fit somewhat differently.
Summary of Contents for 640A/641A
Page 4: ...116669 P1 Rev C 12 99 MKS Type 640A 641A Pressure Controller...
Page 9: ...Table of Contents vi...
Page 11: ...List of Figures viii...
Page 13: ...List of Tables x...
Page 21: ...Customer Support Chapter One General Information 8 This page intentionally left blank...
Page 45: ...Initial Configuration Chapter Two Installation 32 This page intentionally left blank...
Page 85: ...Model Code Description Appendix D Model Code Explanation 72 This page intentionally left blank...