1579A/579A
Chapter 5: Operation (Analog Units)
37
Override the Control Valve
The valve override feature enables the control valve to be fully opened (purged) or closed
independent of the set point command signal:
To open the valve, apply a TTL low to pin 4 or connect pin 4 to pin 5 (analog ground).
To close the valve, apply a TTL low to pin 3 or connect pin 3 to pin 5 (analog ground).
Priority of Commands
The 1579 flow controller executes commands based on a hierarchical command structure. The
highest priority command is Valve Open, followed by Valve Close, and finally the Set Point Control.
Therefore, if the flow controller is operating under Set Point Control, you can send a Valve Open
command to force the valve to the full open position.
Note
When both the Valve Close and Valve Open pins are pulled down, the
Valve Open command takes precedence and the valve is moved to the
open position.
Summary of Contents for 1579A
Page 8: ...Table of Contents 1579A 579A viii This page intentionally left blank...
Page 12: ...Safety Information 1579A 579A 12 This page intentionally left blank...
Page 16: ...Chapter 1 General Information 1579A 579A 16 This page intentionally left blank...
Page 20: ...Chapter 2 Shipment 1579A 579A 20 This page intentionally left blank...
Page 28: ...Chapter 3 Connectors and Control Elements 1579A 579A 28 This page intentionally left blank...
Page 38: ...Chapter 5 Operation Analog Units 1579A 579A 38 This page intentionally left blank...
Page 70: ...Chapter 10 Maintenance 1579A 579A 70 This page intentionally left blank...
Page 74: ...Appendix A Product Specifications 1579A 579A 74 This page intentionally left blank...
Page 82: ...Appendix C Gas Correction Factors 1579A 579A 82 This page intentionally left blank...
Page 84: ...Appendix C Gas Correction Factors 1579A 579A 84 This page intentionally left blank...