184
-
Service Valve
(three-way valve)
Charge hose
(Designed specifically for R22)
Compound
pressure
gauge
Pressure
gauge
Gauge Manifold
(Designed specifically for R22)
Handle Hi.
Vacuum pump
Vacuum pump adapter
(Anti-reverse flow type)
(Designed specifically for R22)
Charge hose
(Designed specifically for R22)
Service Port
–0.1MPa
(–76cmHg)
Handle Lo
Service Valve
(two-way valve)
(c)
Air purge
(i)
Tighten all flare nuts in the pipings both indoor and outside will so as not to cause leak.
(ii)
Connect service valve, charge hose, manifold valve and vacuum pump as is illustrated below.
(iii) Open manifold valve handle Lo to its full width, and perform vacuum or evacuation.
Continue the vacuum or evacuation operation for 15 minutes or more and check to see that the vacuum gauge reads – 0.1 MPa
(– 76 cmHg).
(iv) After completing vacuum operation, fully open service valve (Both gas and liquid sides) with hexagon headed wrench.
(v)
Check for possible leakage of gas in the connection parts of both indoor and outdoor.
¡
Please use an anti-reverse flow type vacuum pump adapter so as to prevent vacuum pump oil from running back into the system.
Oil running back into an air-conditioning system may cause the refrigerant cycle to break down.
Additional refrigerant charge
¡
19 type
Additional refrigerant charge is not required at all.
¡
25 type
When refrigerant piping exceeds 15m conduct additional refrigerant charge by weight after refrigerant piping completion.
Additional charge amount per meter = 25g/m
[Example]
How much amount of additional charge for 25m piping?
(25 – 15)m
×
25g/m = 250g
250g for additional charge
(d)
Insulation of connecting portion
(i)
Cover the connecting portion of the refrigerant piping with the pipe cover and seal them.
If neglecting to do so, moisture occurs on the piping and water will drip out.
(ii)
Finishing and fixing
1)
Tie up the piping with wrapping tape, and shape it so
that it conforms to which the pipe is attached.
2)
Fix them with clamps as right figure.
Cover the exterior portion with cov-
ering tape and shape the piping so
it will match the contours of the
route that the piping to take. Also
fix the wiring and pipings to the
wall with clamps.
Insulation
Refrigerant piping
Electrical wiring
Covering tape
Drain hose
Tapping screw
Vinyl tape
To cover the connecting portion with
insulation materials, cut upper portion and
then seal it with insulation materials.
Summary of Contents for SRK10CES
Page 2: ...TECHNICAL MANUAL...
Page 204: ...202 MEMO...
Page 213: ...211...
Page 227: ...225...
Page 233: ...231...
Page 236: ...CRBE0226 1 3 4 2 5 6 7 8 9 10 11 12 13 PANEL FAN ASSY 234...
Page 244: ...CRBE0228 9 15 7 8 1 2 4 5 6 12 13 14 10 11 3 PANEL FAN ASSY 242...
Page 248: ...CRBE0227 11 15 16 1 2 3 5 6 7 8 9 12 13 14 4 10 PANEL FAN ASSY 246...
Page 252: ...CRBE0221 12 16 17 1 2 3 5 6 7 8 9 10 13 16 14 15 4 11 PANEL FAN ASSY 250...
Page 256: ...05 0 CRBE0224 2 1 5 16 3 9 11 12 4 7 8 6 6 17 17 10 13 15 14 PANEL FAN ASSY 254...
Page 260: ...2005 ROOM AIR CONDITIONING TECHNICAL HANDBOOK...