2 - 11
2 SYSTEM CONFIGURATION
2.3 System Configuration Equipment
(1) Motion controller related module
Part name
Model name
(Note-1)
Description
Current
consumption
5VDC[A]
Remark
Motion controller
Q170MCPU
Power supply, PLC CPU, Motion CPU, all-in-one type
(Attachment battery (Q6BAT), external I/O connector, 24VDC power
supply connector and connector for forced stop input cable)
• Motion CPU area
Up to 16 axes control, Operation cycle 0.44[ms] or more, Servo program
capacity 16k steps
• PLC CPU area
Program capacity 20k steps, LD instruction processing speed 0.02
μ
s
2.0
Servo external
signals interface
module
Q172DLX
Servo external signal input 8 axes
(FLS, RLS, STOP, DOG/CHANGE
×
8)
0.06
Manual pulse
generator interface
module
Q173DPX
Manual pulse generator MR-HDP01/Incremental synchronous encoder
interface
×
3, Tracking input 3 points
0.38
Manual pulse
generator
MR-HDP01
Pulse resolution: 25PLS/rev(100PLS/rev after magnification by 4)
Permitted axial loads Radial load: Up to 19.6N
Thrust load: Up to 9.8N
Permitted speed: 200r/min(Normal rotation), Voltage-output
0.06
Battery Q6BAT
Large capacity
battery
Q7BAT
For memory data backup of RAM built-in Motion controller
——
Large capacity
battery holder
Q170BAT-SET
Battery holder for Q7BAT (Attachment Q7BAT)
——
Cable for forced
stop input
(Note-2)
Q170DEMICBL M
Length 0.5m(1.64ft), 1m(3.28ft), 3m(9.84ft), 5m(16.40ft), 10m(32.81ft),
15m(49.21ft), 20m(65.62ft), 25m(82.02ft), 30m(98.43ft)
——
Connector for
forced stop input
cable
Q170DEMICON
Connector for forced stop input cable production
——
Q52B
Number of I/O modules installed 2 slots, type not requiring power supply
module
0.08
Extension base unit
(Note-3)
Q55B
Number of I/O modules installed 5 slots, type not requiring power supply
module
0.10
QC05B Length
0.45m(1.48ft.)
QC06B Length
0.6m(1.97ft.)
QC12B Length
1.2m(3.94ft.)
QC30B Length
3m(9.84ft.)
QC50B Length
5m(16.40ft.)
Extension cable
QC100B Length
10m(32.81ft.)
——
Summary of Contents for Q170MCPU
Page 1: ......
Page 19: ...A 18 MEMO ...
Page 81: ...2 54 2 SYSTEM CONFIGURATION MEMO ...
Page 135: ...5 10 5 START UP PROCEDURES MEMO ...
Page 171: ...7 6 7 POSITIONING DEDICATED SIGNALS MEMO ...
Page 225: ...APP 54 APPENDICES MEMO ...
Page 228: ......