![Mitsubishi FR-E800 Series Sample Screen Manual Download Page 49](http://html1.mh-extra.com/html/mitsubishi/fr-e800-series/fr-e800-series_sample-screen-manual_1809262049.webp)
49/79
BCN-P5999-1305-1c
6.2.2 Preparation before Utilization
To utilize [Controller Setting] of the inverter in this sample screen as CH2 with [Utilize Project] function, [Controller
Setting] of this sample screen needs to be changed from CH1 to CH2, and the setting for the inverter also needs to
be set to CH2 of [Controller Setting] in user's project data before utilization.
Perform the setting of the sample screen according to the procedures below.
■How to change [Controller Setting] of this sample screen from CH1 to CH2
(1) Go to [Common] - [Controller Setting] and check [Use CH2] to perform the setting of the connected inverter.
Because the same value cannot be set to [GOT Communication Port No.] of CH1 and CH2, change the [GOT
Communication Port No] of CH1 to "5037" and set "5036" to [GOT Communication Port No] of CH2.
(2) Go to [Search/Replace] - [Batch edit] to select [CH No]. Check [Project] under [Target] and click [Find Now] to
display "1" in [Before] and [After]. Change the "1" in [After] to "2" and click [Replace].
By this operation, devices set in the screen are set to the settings of CH2 from CH1.