37/79
BCN-P5999-1305-1c
(3) [Machine Diagnosis Execution] screen is displayed. Then touch "OK".
The inverter starts the load characteristics measurement.
(4) STEP3 is displayed when the load characteristics measurement is completed. Then touch "OK".
(3)
(3)
(4)