A - 3 A - 3
[Wiring Precautions]
!
CAUTION
•
When disconnecting the cable with the connector from the module, do not pull the cable by the
cable part, but hold the connector to the module by hand and pull it out to remove the cable.
Failure to do so may result in damage to the module or cable or malfunction due to poor contact.
•
Ground the shielded cable on the encoder (relay box) side.
Failure to do so may result in malfunction.
•
Check the rated voltage and terminal layout before wiring to the module, and connect the cables
correctly.
Connecting a power supply with a different voltage rating or incorrect wiring may cause a fire or
failure.
[Startup and Maintenance Precautions]
!
CAUTION
•
Do not disassemble or modify the module.
Doing so may cause failure, malfunction, injury or a fire.
•
Shut off the external power supply for the system in all phases before cleaning the module or
retightening the terminal screws or module fixing screws.
Failure to do so may result in electric shock.
•
After the first use of the product, do not mount/remove the module to/from the base unit more
than 50 times (IEC 61131-2 compliant) respectively.
Exceeding the limit of 50 times may cause malfunction.
•
Do not touch the terminals while the power is on. Doing so may cause malfunction.
•
Shut off the external power supply for the system in all phases before cleaning the module or
retightening the terminal screws or module fixing screws.
Failure to do so may result in electric shock.
Undertightening the terminal screws can cause short circuit or malfunction.
Overtightening can damage the screw and/or module, resulting in drop, short circuit, or
malfunction.
•
Before handling the module, touch a grounded metal object to discharge the static electricity
from the human body.
Failure to do so may cause the module to fail or malfunction.
[Disposal Precautions]
!
CAUTION
•
When disposing of this product, treat it as industrial waste.
Summary of Contents for QD62
Page 1: ......
Page 2: ......
Page 13: ...A 11 A 11 MEMO ...
Page 55: ...4 18 4 18 MELSEC Q 4 SETUP AND PROCEDURE BEFORE STARTING THE OPERATION MEMO ...
Page 97: ...8 5 8 5 MELSEC Q 8 PROGRAMMING 3 Program example a Set only when the linear counter is used ...
Page 100: ...8 8 8 8 MELSEC Q 8 PROGRAMMING 2 Program example a Set only when the ring counter is used ...
Page 127: ......
Page 128: ......