Task Properties
The properties for the task can be displayed by right clicking the mouse on the required task pool
entry (i.e. Control1) and selecting
Properties
from the menu. The following task settings win-
dow is displayed:
쎲
Task Attributes
–
Event = TRUE: Always execute
–
Interval = 0: Set to zero because
Event
is always true.
–
Priority = 31: 31 is lowest priority i.e. is scanned last.
Before continuing, it is a good idea to “SAVE” the project; click on the Save
Button.
Creation of a new task for the POU "Batch-Count"
The POU "Batch-Count" needs also to be referenced (called) by a task in the ‘Task Pool’.
햲
To create a new task, Right Click on the ‘Task_Pool’ icon on the Project Navigation Window
(PNW) and select
New Task
from the presented menu. Alternatively, follow the previous
procedure, clicking once on the Task_PooI Icon to highlight it on the PNW and click the
‘New Task’
icon on the toolbar.
햳
Enter the name "Count1" into the prompt window as illustrated:
Building a Project
Application Program
Training Manual GX IEC Developer
4 - 31
Summary of Contents for FX2N-32CAN
Page 1: ...MITSUBISHI ELECTRIC FACTORY AUTOMATION Programmable Logic Controllers GX IEC Developer ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 10: ...IV MITSUBISHI ELECTRIC ...
Page 18: ...Modular PLC Training Hardware Course Overview and Requirements 1 2 MITSUBISHI ELECTRIC ...
Page 176: ...Device Edit 8 4 MITSUBISHI ELECTRIC ...
Page 190: ...Assigning DUT Variables to Function Blocks Data Unit Types DUT 10 10 MITSUBISHI ELECTRIC ...
Page 198: ...Array Example Single Dimension Array Arrays 11 8 MITSUBISHI ELECTRIC ...
Page 219: ...Sequential Function Chart SFC SFC Elements Training Manual GX IEC Developer 14 3 ...
Page 230: ...Structured Text Program Example IEC Structured Text 16 4 MITSUBISHI ELECTRIC ...
Page 278: ...PLC Components Glossary Appendix A 18 MITSUBISHI ELECTRIC ...
Page 283: ......