2. Commissioning
MiR1000 Quick start (en) 06/2020 - v.1.2 ©Copyright 2019-2020: Mobile Industrial Robots A/S.
22
The packaging materials are:
•
The bottom of the box (the pallet)
•
The lid of the box (the ramp)
•
The walls of the box
•
The wheel stop board
•
Protective foam blocks: Side blocks and the top layer
•
Protective corner braces. The braces prevent the robot from being damaged by the
transport straps
•
Screws
Packing the robot for transportation
To pack the robot for transportation:
1.
Shut down the robot. See
Shutting down the robot on page 17
.
2.
Open the rear maintenance hatch.
3.
Turn the battery disconnect switch to position
OFF
.
Repeat the steps in section
in the reverse order.