Table 3-1. Recommended AC Circuit Breaker Size
Recommended AC
Model
Circuit
Size (AMPS)
Breaker
CP3000
20 A - 1 Pole
CP3000-PP
20 A - 1 Pole
CPR3000
30 A - 1 Pole
CPR3000-PP
30 A - 1 Pole
CP3200
15 A - 2 Pole
CP3200-PP
15 A - 2 Pole
CPR3200
30 A - 2 Pole
CPR3200-PP
30 A - 2 Pole
CP6000
30 A - 2 Pole
CP6000-PP
30 A - 2 Pole
8.
Connect and secure the ground wires.
Refer to Figure 3-5 for
grounding stud locations. There are two grounding stud loca-
tions for each unit. Connect the AC input ground wire to the
primary grounding stud and the load ground wires to the sec-
ondary grounding stud.
5.0 and 6.0 KVA
Tower
Grounding
Studs
2.1 and 3.1 KVA
Tower
2.1 and 3.1 KVA
Rack-Mount
Grounding
Studs
Figure 3-5. Grounding Stud Locations for Tower and Rack-Mount Models
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
ELECTRICAL SHOCK HAZARD. The UPS may contain HIGH VOLT-
AGES. These high voltages can damage equipment and in-
jure or kill personnel.
N O
N O
N O
N O
N O T E
T E
T E
T E
T E
This symbol indicates primary equipment grounding
point. This symbol indicates secondary equipment
grounding point.
WARNING
!
NOTE
6.0 KVA
3.1 KVA
3.1 KVA
Tower
Tower
Rack-Mount
Section 3
Installation
Summary of Contents for Continuous Power Series
Page 1: ...6 0 Owner s Manual...
Page 48: ...4 6 NOTES Section 4 Operation...