12-2
12.1
Overview
To ensure that the equipment is ready for operation at any time, the following tests or inspections should be performed:
Routine check
Automatic test
User test
Electrical safety tests.
In case of any damage or abnormity, remove the equipment from use. Contact the hospital’s biomedical engineers or
your service personnel immediately.
12.2
Maintenance and Testing Schedule
To ensure that the equipment is ready for operation at any time, perform the following tests as recommended:
Inspection/Test item
After each use
Daily
Weekly
Monthly
Make sure that the status indicator is green
√
√
√
√
Check the status of the equipment and accessories
√
√
√
Perform user test
√
Replace
pads
√
Check the expiration date of the pads and battery
√
√
Export patient data through a USB device
√
12.3
Carrying Out Maintenance and Testing
The equipment performs selftest to check the buttons, battery status, pads status, charge/shock functions, and
measurement performance, including:
Power-on test;
Realtime test;
Battery-insert test;
Automatic test; and,
User test.
You can send the test results to the Device Management System through wireless network. For more details, see the
Help
for AED ALERT Device Management System.
Summary of Contents for BeneHeart D1
Page 1: ...BeneHeart D1 Automated External Defibrillator Operator s Manual...
Page 2: ......
Page 8: ...VI FOR YOUR NOTES...
Page 42: ...6 6 FOR YOUR NOTES...
Page 50: ...7 8 FOR YOUR NOTES...
Page 58: ...9 6 FOR YOUR NOTES...
Page 86: ...B 4 FOR YOUR NOTES...
Page 88: ...C 2 FOR YOUR NOTES...
Page 92: ...D 4 FOR YOUR NOTES...
Page 96: ...E 4 FOR YOUR NOTES...
Page 100: ...F 4 FOR YOUR NOTES...
Page 102: ...G 2 FOR YOUR NOTES...
Page 104: ......
Page 105: ......
Page 106: ...P N 046 004673 00 3 0...