5-6
6
After mounting the pump shell, install the pump head on the pump.
7
After installing the pump head, connect the tubing with the tubing that goes
through the backboard and the waste tubing. The pump tubing on the left
should be connected to the tubing that goes through the backboard, the pump
tubing on the right to the waste tubing.
8
After connecting the tubing, slip the tubing that goes through the backboard
into the analyzer until the adapters does not expose to the outside.
9
Check the installation for any errors. Connect the analyzer to the power supply
and calibrate the pump. Please refer to the relevant part of the operator’s
manual for calibration method.
BIOHARZARD
When replacing the pump tubing, wear gloves and lab coat and, if
necessary, goggles. In case your skin contacts the waste, follow
standard laboratory safety procedure and consult a doctor.
Pinch the
buckles to lock
the pump head
the pump tubing on
the right to the waste
tubing.
Install the pump
head on the pump,
with the motor
shaft into the
installation hole
The pump tubing on
the left should be
connected to the
tubing that goes
through the
backboard.
Summary of Contents for BA-88A
Page 1: ...BA 88A Semi auto Chemistry Analyzer Operation Manual...
Page 2: ......
Page 6: ......
Page 18: ......
Page 21: ...III Appendix C External Printer C 1 Appendix D Supplies D 1...
Page 22: ......
Page 28: ......
Page 78: ......
Page 96: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 107: ...P N BA89 20 87038 1 0...