OM-244 997 Page 15
E. Connecting End Subframes To Rails And Installing Leveling Feet
1
End Subframes
Use eight bolts AA and eight
locknuts ZZ at each angle bracket
as shown to connect end
subframes and rails.
Tighten all bolts and locknuts.
2
Leveling Foot
Install four leveling feet to bottom of
end subframe tubes.
Do not tighten leveling feet at this
time.
AA and ZZ
Tools Needed:
1/2 in.
hex bit 3/16 in.
1
2
Attention:
If the welding table has a solid top and no optional tool chest, proceed to Subsection J.
If the welding table has a solid top and an optional tool chest, proceed to Subsection H.
If the welding table has an X-pattern top and an optional tool chest, proceed to Subsection G.
If the welding table has an X-pattern top and no optional tool chest, proceed to Subsection F.
F. Installing Dust Tray Rails To Welding Table (Use With An X-pattern Top And No Optional Tool Chest)
.
Use rails and hardware that
came with the dust tray.
1
Dust Tray Rail
Use four bolts AA and four locknuts
ZZ and install dust tray rails to the
welding table.
Tighten all bolts and locknuts.
Do not install dust tray at this time.
Tools Needed:
AA and ZZ
1/2 in.
hex bit 3/16 in.
AA and ZZ
AA and ZZ
Side View
1