OM-244 997 Page 28
M. Installing Stiffener Brackets And Work Lead Tab
.
To level the 60S or 60SX,
adjust leveling feet for the
center subframe first. Then
adjust leveling feet for the end
subframes.
After setting the welding table in
place, make final adjustments to
leveling feet keeping the tops level
and the feet solid on the floor.
Tighten jam nuts on feet at this time.
1
Stiffener Brackets
Use three bolts EE and three
locknuts ZZ and install two cross
members to rear of center and end
subframes.
2
Tapped Holes For Work Lead
Tab
3
Work Lead Tab
Attach work lead tab with one bolt
DD to bottom side and at the rear of
the tops using
any one
of the four
tapped holes.
Tools Needed:
1
1
1/2 in.
hex bit 3/16 in.
EE and ZZ
EE and ZZ
EE and ZZ
2
2
Top View
Rear
2
2
3
DD
N. Grounding The Welding Table
!
Connect welding table to a
good electrical ground
(independent of the welding
leads) unless a qualified
person assures it is safe to
work on an ungrounded
workpiece.
1
Ground Bolt
2
Tapped Hole For Ground Bolt
Use the supplied ground bolt to
connect the welding table to a good
electrical ground according to
national, state, and local codes.
Tools Needed:
hex bit 3/16 in.
1
2