Installation
*INSTALLATION*
33
Installation requirements
The heat-pump dryer must only be installed and commissioned by
a Miele Service engineer or a Miele-authorised Service dealer.
The heat-pump dryer must be installed in accordance with all rel-
evant regulations and applicable standards.
This heat-pump dryer must only be operated in a room that has
sufficient ventilation and which is frost-free.
General operating conditions
This heat-pump dryer is intended only for use in a commercial envir-
onment and must only be operated indoors.
Ambient temperature for optimum heat-pump operation:
+
10 °C to
+
40 °C
The ambient temperature for the heat-pump dryer must be at least
10 °C.
At lower ambient temperatures, there is a risk of ice forming on the
lower heat exchanger. This can also result in unexpected condens-
ate formation.
Depending on the nature of the installation site, sound emissions and
vibrations may occur.
Tip:
Have the installation site inspected and seek the advice of a pro-
fessional in instances where increased noise may cause a nuisance.
Transport
The tumble dryer and heat pump must be separated from one an-
other before being transported. The machines may be damaged if
they are transported without being separated.
The tumble dryer and the heat pump must not be transported
without transport pallets.
Suitable transport aids must always be used during transportation.
Tilting the heat pump by more than 30° should be avoided if at all
possible.
After the heat pump has been transported, it should be left to stand
for approximately one hour before commissioning. If the heat pump is
subjected to especially strong vibrations or is tilted by more than 30°,
it should be left to stand for up to 24 hours.