Initial commissioning
19
Skipping payment
device set-up
11:02
Payment system
No payment
system
Programme
control
Timed op. +
impul.counter
Timed
operation
COM module
OK
Touch the
No payment system
sensor control.
Touch
OK
to confirm.
The display will change to the next setting.
Completing the initial commissioning process
The commissioning process is complete when a programme lasting
longer than 10 minutes has been carried out in full.
If the power is interrupted prior to the start of the first drying pro-
gramme (e.g. if the machine is switched off with the
button), the
initial commissioning process can be completed again. Once a dry-
ing programme has been running for over 10 minutes, the initial
commissioning process cannot be performed again.
In the main menu, touch the
Programmes sensor control.
11:02
Cottons
Programmes
Cottons PRO
Minimum iron
Delicates
Cottons
Woollens
Swipe to the left with your finger until the
Timed drying cool air
pro-
gramme is displayed.
11:02
Programmes
Woollens
Timed drying
hygiene
Basket - Low
temperature
Delicates
Timed drying
cool air
Timed drying
warm air
Touch the
Timed drying cool air
programme.
Touch the flashing
Start/Stop
sensor control.
After this programme has finished, the tumble dryer is ready for use.