- 9 -
* There are three green LED indicators on the rear panel:
LEDs Description
Power
Steady light confirms that the Print Server is powered
on.
LPT
When it blinks, the printer connected is printing.
Link/Act
Steady light confirms that the print server has a good
connection to your network.
When it blinks (briefly dark), the print server is
receiving/ transmitting data from/to the network.
Summary of Contents for SP755C
Page 30: ...30 Factory Reset Please click Yes to reload the factory settings of the print server...
Page 32: ...32 About This screen displays the information of the print server...
Page 44: ...44 Create a new Standard TCP IP Port Click Next...
Page 46: ...46 Select LPR and put the Port name in the field labeled Queue Name Then Click OK Click Next...
Page 48: ...48 Click Next Select a Printer Name...
Page 49: ...49 Sharing can be enabled here Also a Test Page can be printed to confirm proper configuration...
Page 50: ...50 When the Test Page has been printed click Finish to complete the installation...
Page 52: ...52 Select Local Printer Create a new Standard TCP IP Port...
Page 55: ...55 Click Next Click Finish...