
Monitoring a Degas Operation
The SmartPrep Status dialog box, shown below, enables you to monitor degas op-
erations and stop gas flow after samples are degassed. (Refer to Show Status in
Chapter 3 for a detailed description of this dialog box.) When the degas opera-
tion is complete, refer to Completing a Degas Operation in this chapter.
For each sample station, the following information is displayed:
Sample
The name and path of the sample information file
being used.
Status
The current degas status as described below.
1. Idle
2. Stage n of n: Ramping to nnn
o
C at
nn
o
C/min
3. Stage n of n: Soaking (number of
minutes remaining)
4. Cooldown
Temp
Displays the current temperature (+10
o
C) of the
sample being degassed.
Gas Valve
Informs you whether the heating station’s gas
valve is opened or closed.
SmartPrep
Degassing Samples
Sep 98
2-29
Summary of Contents for SmartPrep 065
Page 1: ...SmartPrep 065 Operator s Manual V2 02 065 42801 01 March 2002...
Page 4: ......
Page 8: ......
Page 10: ......
Page 26: ......
Page 28: ......
Page 60: ......
Page 61: ...CHAPTER 3 SMARTPREP MENUS File Menu SmartPrep Menu Reports Menu Options Menu...
Page 62: ......
Page 100: ......
Page 101: ...CHAPTER 4 MAINTENANCE...
Page 102: ......
Page 105: ...CHAPTER 5 ORDERING INFORMATION...
Page 106: ......
Page 108: ......
Page 109: ...APPENDIX A FORMS...
Page 110: ......
Page 112: ......
Page 114: ......
Page 115: ...APPENDIX B ERROR MESSAGES...
Page 116: ......
Page 127: ...INDEX...
Page 128: ......