Basic Configuration
49
•
This item configures start date and end date for selected schedule. It can’t be modified directly. Start date is selected
date from calendar on the top of the window. End date can be enter from calendar by clicking ... button.
•
Repeat Term
•
•
•
Figure 3.23. Repeat Term
•
This item configures repeat term of selected schedule.
•
Add
•
This item adds a new schedule. The new schedule will be added to the selected date by clicking this button. Desirable
schedule is made of name, type of repeat, start and end date, repeat term after clicking Add button.
•
Remove
•
This item removes the selected schedule.
You should select the start date of the schedule on Calendar. Clicking Add button on the right top of window is needed to
add a specific date.
Figure 3.24. After Clicking Add Button Screen
The middle section of the configuration window will be enabled after the untitled schedule is added to List below
Calendar. Above screen is for the result of selecting February 5th, 2009 from Calendar and clicking Add button. 3th and
26th day from Calendar are displayed with bold font because those day have the registered schedule already.
You need to change the repeat type to Repeat and select the end date from Calendar by clicking ... button.