Smart Swing 3
®
Installation Manual
SMART SWING 3 ®
Page 12 of 36
Step 2
. Remove the
motor/gearbox and control board
from the back plate
Make through holes on the back
plate for mounting header where
appropriate.
Step 3.
Power Supply
Make sure all power is turned
OFF before handling the supply
wires. This should be done by a
certified electrician and within the
guidelines of the enforced local
electrical codes.
Drill holes for the high voltage
wires in backing plate.
Pull the power supply into the
header at the same time as the
header assembly is positioned.