Page 9
4.4.
Designation of parts in the control box
21
4.5.
General specifications
22
4.6.
Scope of delivery
22
4.7.
Technical description
22
4.7.1.
General specifications
22
4.7.2.
Connection sockets
22
4.7.3.
Protection of the connection outlets
23
4.7.4.
Variospeed load-dependent speed control
23
4.7.5.
Oil automatic shut-off
23
5.
OPERATION OF THE POWER GENERATOR
24
5.1.
Transport of the power generator
24
5.2.
Setting up the power generator
25
5.3.
Prerequisites for trouble-free operation
26
5.3.1.
Fuel specification
26
5.3.2.
Lubricants specification
26
5.4.
Preparations for initial commissioning
27
5.5.
Daily checks before putting into operation
28
5.5.1.
Checking for completeness and damage
28
5.5.2.
Checking the oil level in the engine
28
5.5.3.
Checking the fuel level
29
5.5.4.
Filling with fuel (integral tank)
29
5.5.5.
Filling with fuel (external tank, fuel filling kit)
29
5.5.6.
Connection of the consumers
30
5.5.7.
Earthing the power generator
30
5.6. OPERATION
31
5.6.1. Starting
31
5.6.2.
Electrical start-up
31
5.6.3.
Manual start-up
32
5.6.4.
Interrupting operation
32
5.6.5.
Putting out of operation
32
Con
ten
ts
Summary of Contents for BSKA 14 EV SS curve
Page 2: ......
Page 20: ...Seite 18 Ihr Stromerzeuger im Detail 4 IHR STROMERZEUGER IM DETAIL 4 1 Abmessungen ...
Page 48: ......
Page 66: ...Page 18 Your power generator in detail 4 YOUR POWER GENERATOR IN DETAIL 4 1 Dimensions ...
Page 93: ......
Page 94: ......
Page 95: ......