
39
SHK 200S
SHK 200S-6
In this menu we have the option to change settings
for the additional heat (built-in electric module). More
information after selecting "?".
Factory setting:
add.type: step controlled
positioning before QN10
max step: 3
binary stepping: inactive
fuse size: 20 A
transformation ratio: 300
In this menu, it is possible to select slave devices.
More information after selecting "
?".
Factory setting:
slave 1: active (EB101)
This menu is about creating cascades with heat pumps.
Recommended setting values are:
+ 35 for surface heating,
+ 55 for radiator heating.
Detailed information on curve settings - see pt.
"User
settings".
In this menu it is possible to edit the device operation
scheme. More information after selecting "
?".
In this menu, set the current date and time. In addition,
we have the ability to choose the display format and
time zone.
In this menu it is possible to edit the minimum flow tem
-
perature of the heating system. More information after
selecting "?".
Factory setting:
climate system 1: 20 C
In this menu it is possible to edit the maximum flow
temperature of the heating system. More information
after selecting "?".
Factory setting:
climate system 1: 55 C
In this menu it is possible to edit the heating curve
specified for the SHK 200S / SHK 200S-6 unit. More
information after selecting "?".
Factory setting:
Heating curve: 7
8/18 Addition
9/18 Installed slaves
10/18 Docking
11/18 Time & date
12/18 Min. flow line temp.
13/18 Max flow line temp.
14/18 Heating curve
Chapter 9 |
Control
IMPORTANT
In the case of a lower security (for the main security in the
building), this value can be set lower than 20 A. Caution,
this will cause a decrease in the device's power.
You can not set a value higher than 20A.
IMPORTANT
Changing the diagram will cause the device to operate
incorrectly.
CAUTION
The above settings regarding the device operating
schedule can only be edited by qualified personnel.
Summary of Contents for SHK 200S
Page 2: ......
Page 70: ...70 SHK 200S SHK 200S 6 Diagram of electrical connections Chapter 13 Technical data...
Page 71: ...71 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 72: ...72 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 73: ...73 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 74: ...74 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 75: ...75 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 76: ...76 SHK 200S SHK 200S 6...
Page 77: ...77 SHK 200S SHK 200S 6...
Page 78: ...78 SHK 200S SHK 200S 6...
Page 79: ......
Page 80: ...METRO THERM A S RUNDINSVEJ 55 DK3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 242 1909...