
29
SHK 200S
SHK 200S-6
Chapter 7 |
Start-up and regulation
Circulation pump
Pump speed
The circulation pump in SHK 200S / SHK 200S-6 is
controlled by frequency, and is automatically regulat-
ed via control and based on the heating demand.
Available pressure, circulation pump.
Later regulation, venting
Initially, air is removed from hot water, and venting may
be necessary. If gurgling can be heard in the heating
system, the entire system needs additional venting.
The installation is vented through vents. When venting,
SHK 200S / SHK 200S-6 must be switched off.
Start
Commissioning
Start guide
IMPORTANT
There must be water in the climate system be-fore the
switch is set to „
I
”.
The fi rst time the installation is started a start guide is
started. The start guide instructions state what needs
to carried out at the fi rst start together with a run
through of the installation’s basic settings.
The start guide ensures that start-up is carried out
correctly and cannot be bypassed. The start guide
can be started later in menu 5.7.
During the start-up guide, the reversing valves and
the shunt are run back and forth to help vent the heat
pump.
1. Set switch (SF1) on controller to position "
I
".
2. Follow the instructions in the display's start guide.
If the start guide does not start when you start the
controller , start it manually in menu 5.7.
In order to start the heat pump
1. Turn on the power of the SHK 200S / SHK 200S-6
unit making sure that the METROAIR L unit has
been properly connected to the power supply.
2. Follow the instructions displayed in the control-
ler's start-up wizard or start the start-up wizard in
menu 5.7.
ADVICE
See page 38 for a more in-depth introduction to the
installation’s control system (operation,menus etc.).
CAUTION
As long as the start guide is active, no function in con-
troller will start automatically. The guide will appear at
each restart of controller, until it is deselected on the
last page.
Summary of Contents for SHK 200S
Page 2: ......
Page 70: ...70 SHK 200S SHK 200S 6 Diagram of electrical connections Chapter 13 Technical data...
Page 71: ...71 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 72: ...72 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 73: ...73 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 74: ...74 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 75: ...75 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Page 76: ...76 SHK 200S SHK 200S 6...
Page 77: ...77 SHK 200S SHK 200S 6...
Page 78: ...78 SHK 200S SHK 200S 6...
Page 79: ......
Page 80: ...METRO THERM A S RUNDINSVEJ 55 DK3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 242 1909...