MI 2087 Instaltest 61557
Memory and other operations
53
4. Memory and other operations
4.1. Storing of test results
In order memory manipulation to be as clear as possible and recognition of
measurement location stored result belongs to be as understandable as possible,
practical model of electric installation is used.
Let’s see a general, practical diagram of electric installation usually met, when dealing
with measurements on electric installations (figure 47).
On basis of this diagram, the following basic structure can be defined:
FUSE CABINET
Offices
FUSE
Lamps
FUSE
Wall outlets
FUSE
Computer system
.
.
FUSE CABINET
Development dpt.
FUSE
Lamps
FUSE
Working station
.
.
FUSE CABINET
Industrial hall
FUSE
Lamps
FUSE
Wall outlets
FUSE
CNC machine
.
.
Two main levels are involved namely:
FUSE CABINET
(higher level) and
FUSE
(lower level)
This is the system, used in the Instaltest 61557. Instead of actual names of FUSE
CABINETS and FUSES three-digit code is used. The code range is 001 up to 999.